Report 2014/03
Railway report 2014/03
At 15:25 on Monday 22 July 2013, Hector Rail AB's northbound freight train 41631 derailed at kilometre point 281.5 between Kvam and Sjoa on the Dovrebanen line. The train consisted of one locomotive and 14 empty timber wagons. Wagons 4 to 13 ran completely or partially off the rails, and the train came apart between wagons 6 and 7.
Photo: AIBN
Safety recommendation
Safety recommendation JB no 2014/04T
On 22 July 2013, track buckling occurred at kilometre point 281.5 between Kvam and Sjoa on the Dovrebanen line. Hector Rail AB's northbound freight train 41631 derailed as a consequence of this. Three days prior to the incident, packing had been carried out due to uneven settlement of the track. It is assumed that the work that was done, together with high rail temperatures, temporarily weakened the track's lateral stability to a sufficient extent to cause buckling. The packing had not been followed up by daily inspection visits.
The Accident Investigation Board Norway recommends that the Norwegian Railway Authority recommend that the Norwegian National Rail Administration review the inspection procedures for this type of track work, assess whether they are adequate and, if applicable, update the procedures.
Safety recommendation JB no 2014/05T
The purpose of establishing permanent geodetic control marks along the track is to define the track's position in an external local reference system. The method is based on comparing the theoretical position of the track with the position of the track relative to a set of geodetic control marks along the track. Excessive deviation between these positions indicates that the track has been displaced, and that stresses may have developed in the track. A lateral displacement towards the inside of a curve will reduce the fastening-down (neutral) temperature of the rails, and thus increase the stresses at high temperatures. Geodetic control marks had been surveyed at Heggerusta on the Dovrebanen line, but the marks had not been maintained.
The Accident Investigation Board Norway recommends that the Norwegian Railway Authority recommend that the Norwegian National Rail Administration establish a binding progress schedule for updating existing track sections and for establishing geodetic/permanent geodetic control marks on any sections lacking such marks.
Facts
Location | Between Kvam and Sjoa, Dovre Line |
Occurrence date | 22.07.2013 |
Train No | 41631 |
Type of Transportation | Freight train |
Type of occurrence | Derailment |
Operator | Hector Rail AB |
Section | Dovrebanen |